construction
6 |
|
We now have Video
Clips of recent construction on the Video One Page
|
Two Time Line Views of Construction |
| Home Construction 1 Construction 2 Construction 3 Construction 4 |
![]() |
![]() |
![]() |
|
Click to enlarge, click your "back" button restore |
December 29, 2006 | December 30,
2006 The peak is finished |
January 17,
2007 Framework and wind barrier installation has begun |
| The first six
slides are of the framework over a 5 week period. The next 8 are from the same position on the second floor over a 4 week period |
![]() |
![]() |
![]() |
| January 18, 2007 | January 25, 2007 | February 8, 2007 | |
![]() |
![]() |
![]() |
![]() |
| January 11, 2007 The wire mesh is in place over the aluminum decking |
January 12 The cement is poured in the morning |
January 12 The cement is finished in the afternoon |
January 17 The framework installation has begun |
![]() |
![]() |
![]() |
![]() |
| January 18 Installation for the Ductwork for air conditioning and heating is underway |
January 25 Ductwork nearly complete |
February 1 Framework for Drywall |
February
8 Ready for Drywall |
![]() |
![]() |
![]() |
![]() |
| January 12 The cement pump and hose to the second floor |
February 1 |
The Topping Out Ceremony
January 4, 2007
A Brief, but beautiful ceremony marking the
completion of the steel work on Thursday morning at 8:30
Rev. George Morris and Frank Wisniewski rode the boom lift to mount both the
American Flag and the Methodist Flag
at the crown of the building. The lift was operated from the ground by
Chuck Roth, Construction Manager.
The Last Beams are Installed