construction 6


 The "Topping Out" Ceremony January 4 - new construction photos


We now have Video Clips of recent construction on the Video One Page

Two Time Line Views of Construction

Home

Construction 1
Construction 2
Construction 3
Construction 4
100_0935.jpg (263814 bytes) aa100_0945.jpg (60942 bytes) hhleftsideExt.jpg (91841 bytes)

Click to enlarge, click your "back" button restore

December 29, 2006 December 30, 2006
The peak is finished
January 17, 2007
Framework and wind barrier installation has begun
The first six slides are of the framework over a 5 week period.

The next 8 are from the same position on the second floor over a 4 week period
leftside1187.jpg (63013 bytes) leftside21198.jpg (63588 bytes) leftside41238.jpg (71024 bytes)
January 18, 2007 January 25, 2007 February 8, 2007
hhwiredeck1151.jpg (112415 bytes) hhraking1159.jpg (71432 bytes) hhsmooth1168.jpg (54384 bytes) hhinsidewalls1183.jpg (70407 bytes)
January 11, 2007
The wire mesh is in place over the aluminum decking
January 12
The cement is poured in the morning
January 12
The cement is finished in the afternoon
January 17
The framework installation has begun
secleft1194.jpg (62476 bytes) secleft21202.jpg (59675 bytes) secleft31229.jpg (53434 bytes) secleft41243.jpg (73773 bytes)
January 18
Installation for the Ductwork for air conditioning and heating
is underway
January 25
Ductwork nearly complete
February 1
Framework for Drywall
February  8
Ready  for Drywall
hhBluePump1158.jpg (70875 bytes) weld1224.jpg (55303 bytes) rightside1190.jpg (71783 bytes) hhfront1182.jpg (94365 bytes)
January 12
The cement pump and hose to the second floor

February 1
Welding Piping

 

 

 

aa100_0916.jpg (64351 bytes) aa100_0945.jpg (60942 bytes) aa100_0966.jpg (58711 bytes)

By the end of last week the "peak" had been finished

aa100_0969.jpg (32473 bytes) aa100_0972.jpg (27821 bytes) aa100_0973.jpg (40769 bytes) aa100_0984.jpg (54791 bytes)
These are aluminum frames used to support the roof over the future choir room Finished Aluminum
aa100_0985.jpg (49052 bytes) aa100_0976.jpg (46839 bytes) aa100_0952.jpg (70218 bytes)

In the upcoming week/s the crane and lift truck will be removed.  
One of the next steps will be to pour cement over the aluminum deck.
On the lower level electrical and plumbing work is underway.

Not for the faint of heart The Decking is done

The Topping Out Ceremony
January 4, 2007

A Brief, but beautiful ceremony marking the completion of the steel work on Thursday morning at 8:30
Rev. George Morris and Frank Wisniewski rode the boom lift to mount both the American Flag and the Methodist Flag
at the crown of the building.  The lift was operated from the ground by Chuck Roth, Construction Manager.

The two photos on the right are by Frank Cahill, and were shot from behind the structure.

ffP1040200.jpg (70870 bytes) ffP1040206.jpg (59482 bytes) leftside51239.jpg (78411 bytes)
aww100_1007.jpg (44155 bytes) aw100_1007.jpg (34077 bytes) aw100_1008.jpg (45308 bytes) aw100_1010.jpg (41999 bytes)
Rev. Morris and Frank Wisniewski on board the boom lift Rev. Morris mounts the Methodist Flag
aww100_1009.jpg (33103 bytes) 100_1012.jpg (788786 bytes) ac100_1013.jpg (51756 bytes) as100_1017.jpg (52051 bytes)
Zoom of the same shot About 50 people attended the 8:30 ceremony which was accompanied by trumpeter Ralph Buck

The Last Beams are Installed

 

aw100_1038.jpg (87884 bytes) aw100_1037.jpg (68359 bytes) aw100_1035.jpg (40636 bytes) aw100_1036.jpg (32962 bytes)
The mid-morning sun projected these shadows on the back of the Sanctuary  One of the last beams Zoom View of the same
aw100_1034.jpg (37140 bytes) aw100_1033.jpg (51748 bytes) aw100_1032.jpg (38175 bytes) aw100_1028.jpg (39058 bytes)
A small rope is tied on to each side of the beams as a guide Although each beam weighs several hundred pounds, in the
wind it will act just like a sail
aw100_1019.jpg (42745 bytes) aw100_1023.jpg (36576 bytes) aw100_1022.jpg (40670 bytes) These are "Thumbnail Pictures", click on the photo to enlarge, use your Browser's "Back Button" to restore.