construction 7


 New construction photos - March 2007


Home

Construction 1
Construction 2
Construction 3
Construction 4

Construction 5

inside11285.jpg (61540 bytes) inside21287.jpg (63939 bytes) ducts1288.jpg (61649 bytes)

Ductwork and Electrical wiring has begun

The Third Week of March

SteepleSatGood_1480.jpg (40635 bytes) SteepleSatgood2_1482.jpg (27863 bytes) SteepleSat41476.jpg (18402 bytes) SteepleSat61480.jpg (30889 bytes)
This brave soul is Robert Morgan of the SteepleKeeper company who are contracted to paint our Steeple and replace our roof. Each section of ladder is strapped and screwed into the steeple.
Robert is using a harness and lifeline.


Roof41457.jpg (47642 bytes) Roof11461.jpg (66177 bytes) Slate11470.jpg (70208 bytes) Slate21469.jpg (63374 bytes)
The old slates are put in the bucket, and then into the dumpster The new gutters are lead coated copper and will be re-sloped for better drainage Each skid weighs 3500 lbs There are approx. 13 skids of Canadian slate, about 630 pieces per skid
The scissors-lift in the middle photo is used to lift both the wall and the workers. LeftLeft1471.jpg (49004 bytes) lifttruck1472.jpg (68983 bytes) LeftSideSat1467.jpg (53089 bytes)

The First Week of March

sayredeck21283.jpg (60373 bytes) sayredeck1282.jpg (63858 bytes) leftbld1281.jpg (62789 bytes) rightside1284.jpg (63106 bytes)

Cement for the Sayre Center has been poured

Almost all window frames have been installed


100_1309.jpg (315950 bytes) roofrear1308.jpg (53601 bytes) plasticroof1295.jpg (53862 bytes) Streetview1314.jpg (68313 bytes)
On the roof The back of the peak can be seen on the right The end of the Sloan Bld Looking down on Warwick Rd