|
construction
7 |
|
| Home Construction 1 Construction 2 Construction 3 Construction 4 |
![]() |
![]() |
![]() |
|
Ductwork and Electrical wiring has begun |
|||
The Third Week of March
The First Week of March
![]() |
![]() |
![]() |
![]() |
| On the roof | The back of the peak can be seen on the right | The end of the Sloan Bld | Looking down on Warwick Rd |